ZSJH
| Availability: | |
|---|---|
See how warehouse columns, rafters, braces and secondary members fit together before committing the model to downstream drawings. ZSJH develops Tekla steel warehouse models from the agreed design information, with component scope and connection depth defined at the start. The service supports geometric coordination and the model information needed for agreed detailing outputs.
Item | Project Scope |
Input basis | Approved design drawings, grids, levels and model brief |
Primary members | Columns, rafters, beams and braces within scope |
Secondary members | Purlins, girts and supporting plates when included |
Connections | Concept geometry or detailed components as agreed |
Model information | Material, section, member marks and assembly attributes |
Coordination | Architectural and MEP reference files if supplied |
File delivery | Tekla version agreed; IFC and PDF views if included |
Completion criteria | Written model scope and issue status; no assumed LOD |
Factory coordination focuses on assembly orientation, hole access, member segmentation and clashes between attached parts. A reviewed model can feed shop drawings and material reports when those outputs are ordered. CNC export needs an additional check against machine and software requirements.
Use this service for warehouse frame coordination, mixed primary and secondary steel packages, and overseas projects where the contractor needs a reviewable 3D structure. Existing-building interfaces can be modeled from verified survey information.

Check grids and levels first, then member sections, orientation and connectivity. Review duplicate parts, physical clashes and numbering before issue. Model changes are logged against the source drawing revision; geometric acceptance does not replace structural verification.
The model package is transferred through an agreed electronic channel with a version note, reference files and issue register. For export fabrication orders, stable member marks link model assemblies to drawings and packing records, supporting identification after containers reach site.
Related project — Ninghe Coffee Shop in Tianjin, China


ZSJH combines 20 years of industry experience with a professional design team and steel manufacturing resources. AISC and EN 1090/CE-related credentials can be supplied with their applicable scope for project review.

Q1:Is connection design included in modeling?
A1:Only where explicitly ordered. Otherwise, connections follow the design information supplied or approved by the responsible designer.
Q2:Can a model be delivered for another Tekla version?
A2:Confirm the required version before work starts; native backward compatibility must be checked.
Upload your design drawings, required Tekla version and coordination references. Tell us which primary members, secondary members and connections need to appear in the model.
Button: Contact US
sales@zsjhsteel.com | WhatsApp +86-15122582058 | www.zsjhsteel.com
content is empty!