Warehousing and logistics projects have strict requirements for space utilization, large-span structures, construction schedules, and adaptability to automated equipment.
Multi-story steel structure warehouse (4 stories, total height 40m+), total steel structure volume exceeding 100,000 tons, suitable for vertical logistics hubs in urban cores
Grid/truss structure, single span 75-77m, maximum height 31m, suitable for bulk cargo storage and large-volume material stockpiling
High-strength steel frame + closed box-section / double H-section columns, 80% improvement in deformation resistance, compatible with automated heavy-duty sheet material storage and retrieval systems
Adopts a "menu-style delivery" strategy with on-demand component dispatch, achieving an average monthly installation volume of 20,000 tons
BIM + drone inspection technology enables millimeter-level visual management throughout the steel tructure installation process
Prefabricated components assembled on-site like "building blocks," effectively shortening the construction period