:sales@zsjhsteel.com        WhatsApp:+86-15122582058

Blogs

You are here: Home » Projects » Projects » Tianjin SEW Steel Structure Project from Design to Installation

Tianjin SEW Steel Structure Project from Design to Installation

From drawings to a completed industrial building

The Tianjin SEW project brings the stages of industrial steel construction together in one case. Completed on May 23, 2023, it took nearly four months from design to completion. The site photographs show how fabricated steel members became an industrial building, from the first erected frames to the roof and enclosure taking shape.

Project Tianjin SEW Steel Structure Project
Location Tianjin, China
Building type Industrial steel building
Completion date May 23, 2023
Design to completion Nearly four months
Stages covered Design, detailing, fabrication and site erection

Aerial view of the Tianjin SEW industrial building

Fig1 Aerial view of the Tianjin SEW industrial building

Turning the design into fabrication information

Detailing translates the structural layout into information the shop and site teams can use, including member dimensions, connection locations and bolt-hole layouts. Coordinating these details with erection requirements gives both teams a common drawing reference and helps the contractor confirm what belongs in the supply package.

From fabricated members to an erected frame

The workshop photos show internal plates and stiffening details. At the site, the photo sequence captures staged members, cranes and the gradual assembly of the steel frames. Roof work and enclosure followed as the main frame took shape. Coordinating deliveries with the erection sequence can reduce the amount of sorting and repositioning needed at the site.

Steel assembly with internal stiffeners for the Tianjin SEW project

Fig2 Steel assembly with internal stiffeners for the Tianjin SEW project

Early steel frame erection at the Tianjin SEW project site

Fig3 Early steel frame erection at the Tianjin SEW project site

Steel frames and roof framing inside the Tianjin SEW building

Fig4 Steel frames and roof framing inside the Tianjin SEW building

Engineering and supply support for industrial projects

ZSJH Steel can support structural design and analysis, 3D modeling and detailing, fabrication, quality inspection, packing and shipment coordination. Contractors with drawings can start with a drawing review and fabrication quote. For early-stage projects, we can discuss the structural concept, supply scope and delivery milestones.

Request a steel structure quote

Send your project location, building use, dimensions, eave height, span, crane requirements and target start date. Include any available PDF, DWG or IFC files so we can review the design and supply scope and prepare a quote.Submit Your Project Details


Quick Links

Products

Contact Us

 Telephone: +86-151-2258-2058
 WhatsApp:  +8615122582058
 Email: sales@zsjhsteel.com
 Address: China,Tianjin