ZSJH
| Availability: | |
|---|---|
ZSJH fabricates steel roof beams to approved drawings for factory roofs, workshops and industrial extensions. The beam package can include rolled or welded built-up sections, end plates, bolt holes, stiffeners and designed splices. Beam geometry is coordinated with the column grid, roof slope, purlins and bracing.
Parameter | Reference and customization |
Eave height | 6 m reference height; customized to drawings. Internal clear height is confirmed separately. |
Longitudinal column spacing | 6 / 9 / 12 / 18 m options for project review; selected through structural design. |
Single-span requirement | 20 m and above as a reference project requirement; the section and framing arrangement require engineering design. |
Building length and width | Customized to layout. Width on the column grid equals one span or the sum of multiple spans. Length depends on bay count and spacing. |
Geometry example | 60 m long × 24 m wide, 24 m single span, 6 m eave height and ten 6 m longitudinal bays. Illustrative layout only. |
These are building-level reference inputs, not fixed dimensions or a load rating for an individual roof beam. A sloping roof rafter or transport segment does not necessarily have the same length as the building span. Roof dead/live loads, wind, snow, suspended services and solar equipment where applicable must be included in the design brief.
Fabrication item | Specification |
Beam form | Rolled H/I section or welded built-up section; constant or tapered depth as designed. |
Material options | Q235B or Q355B; other project-specified grades subject to review and availability. Grades are not automatically interchangeable. |
Plate thickness | Specify web thickness tw, flange thickness tf, end-plate thickness te and stiffener thickness separately. Values follow approved calculations and fabrication drawings. |
Connections | Specify end-plate size, hole diameter and pitch, bolt requirements, stiffeners, splice location, weld size and groove details. |
Welding finish and acceptance
For welded built-up beams, the process is selected to suit the steel grade, plate thickness, joint geometry and welding position. Submerged arc welding can be considered for long flange-to-web seams; gas-shielded arc welding for end plates and stiffeners; shielded metal arc welding where suitable for the joint and approved procedure. The confirmed route follows the project Welding Procedure Specification (WPS).
Specify the applicable welding code and edition in the order documents. AWS D1.1/D1.1M may be requested for structural steel work, subject to project review and agreement. Weld sizes, penetration requirements, procedure and personnel qualifications, preheat and interpass controls follow the agreed code, drawings and WPS; the code name alone does not define the entire inspection scope.
Finish route | What to confirm |
Blast cleaning and paint | Surface preparation grade, primer and topcoat system, total dry-film thickness, color and touch-up requirements. Select the system for the actual exposure. |
Hot-dip galvanizing | Confirm suitability of member dimensions, vent/drain details, distortion control and coating requirements. ISO 1461 may be specified for the coating and tests. |
Project coating specification | The ISO 12944 series may be referenced for protective paint systems. Fire protection is specified separately from corrosion protection. |
Acceptance checks cover material identification, beam dimensions and straightness, end plates, bolt-hole positions, weld dimensions and appearance, and the specified finish. UT, MT or other non-destructive testing is arranged where required by the project inspection plan; method, extent and acceptance criteria are agreed before fabrication. ISO 17637 may be specified for visual testing and ISO 17635 for selection of weld NDT methods.
The agreed document package can include material certificates, approved fabrication drawings, dimensional and weld inspection records, finish inspection records and a packing list matched to piece marks. Supplied bolts, secondary framing and erection support are identified separately in the quotation.
Project geometry and drawings → engineering and connection review → design or detailing where required → quotation and drawing approval → material preparation and fabrication → inspection and finish → piece marking, packing and shipment.
Roof beam packages for your project
No. Loads, support conditions, bracing, steel grade, deflection requirements and roof geometry also affect the section. A 20 m or larger span is a design input rather than a standard beam specification.
No. Changing the longitudinal frame spacing changes the roof area carried by each frame. The 6, 9, 12 and 18 m options must each be reviewed against the selected roof and framing system.
Yes, where the approved built-up beam design specifies them. List web, flange, end-plate and stiffener thicknesses separately in the BOM rather than using one plate thickness for the whole beam.
Send ZSJH your drawings or BOM, project location, span and grid, beam sections and plate thicknesses, steel grade, quantities, weld and inspection requirements, finish, delivery destination and target date. If drawings are incomplete, include the building geometry and required design services. ZSJH reviews the scope before confirming the quotation and fabrication details.